{"id":1271,"date":"2023-05-10T08:51:54","date_gmt":"2023-05-10T08:51:54","guid":{"rendered":"https:\/\/www.homebazaar.com\/news\/?p=1271"},"modified":"2023-05-10T09:06:37","modified_gmt":"2023-05-10T09:06:37","slug":"navi-mumbais-upcoming-tunnel-to-reduce-kharghar-travel-time-by-30-minutes","status":"publish","type":"post","link":"https:\/\/www.homebazaar.com\/news\/navi-mumbais-upcoming-tunnel-to-reduce-kharghar-travel-time-by-30-minutes\/","title":{"rendered":"Navi Mumbai\u2019s Upcoming Tunnel To Reduce Kharghar Travel Time By 30 Minutes"},"content":{"rendered":"<p><span style=\"font-weight: 400\">Mumbai&#8217;s transportation network is currently being improved by a number of large infrastructure projects. Mumbai is the financial centre of India. The Kharghar Turbhe Link Road (KTLR), one of the city&#8217;s upcoming major construction projects, is anticipated to lessen travel time from Thane, Mumbai and localities of Navi Mumbai to the Kharghar neighbourhood by 30 minutes.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The state has proposed Rs 2,195 Cr for the Kharghar-Turbhe Link Road project to relieve the significant traffic on the route of the Sion-Panvel highway.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The Kharghar Turbhe Link Road project will be implemented by CIDCO and the link road is anticipated to be finished in the upcoming three years.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The International Corporate Park in Kharghar will be connected to the arterial Sion-Panvel highway by this link road, which runs just opposite Juinagar Railway Station.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The infrastructure project has been hold-up because of a conflict over finance between CIDCO and the Maharashtra Industrial Development Corporation. CIDCO agreed to carry the entire project&#8217;s estimated cost after the Maharashtra State Road Development Corporation opted not to fund this project.<\/span><\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-1276 size-full\" src=\"https:\/\/homebazaar-news.s3.ap-south-1.amazonaws.com\/news\/wp-content\/uploads\/2023\/05\/10090610\/Kharghar-Turbhe-Link-Road-Final-min-1-jpg.webp\" alt=\"Kharghar Turbhe link road\" width=\"732\" height=\"375\" srcset=\"https:\/\/homebazaar-news.s3.ap-south-1.amazonaws.com\/news\/wp-content\/uploads\/2023\/05\/10090610\/Kharghar-Turbhe-Link-Road-Final-min-1-jpg.webp 732w, https:\/\/homebazaar-news.s3.ap-south-1.amazonaws.com\/news\/wp-content\/uploads\/2023\/05\/10090610\/Kharghar-Turbhe-Link-Road-Final-min-1-300x154.webp 300w\" sizes=\"(max-width: 732px) 100vw, 732px\" \/><\/p>\n<p><b>Key Details of this infrastructure project:<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">By avoiding the regular route via the Sion-Panvel Highway, Palm Beach Road and Thane-Belapur Road this link road from Turbhe to Kharghar by Juinagar ensures a seamless journey.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">The Kharghar-Turbhe Link Road, estimated Rs 2195 crore, is planned to relieve traffic on the Sion-Panvel route and reduce travel times by about 30 minutes.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">In order to finish the 5.490 km long KTLR, a 1.763 km tunnel is going to be constructed, which will travel through the Kharghar ranges. The corridor will have four lanes.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">The Complete Project Report \/DPR has been developed by CIDCO, and initial construction work has already started. The procedure for getting the required permission from several agencies is in progress.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mumbai&#8217;s transportation network is currently being improved by a number of large infrastructure projects. Mumbai is the financial centre of India. The Kharghar Turbhe Link Road (KTLR), one of the city&#8217;s upcoming major construction projects, is anticipated to lessen travel time from Thane, Mumbai and localities of Navi Mumbai to the Kharghar neighbourhood by 30 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1275,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31,40],"tags":[94,454,451,453,452,316],"class_list":["post-1271","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infrastructure","category-navi-mumbai","tag-infrastructure-development","tag-infrastructure-project","tag-kharghar","tag-kharghar-turbhe-link-road","tag-ktlr","tag-navi-mumbai"],"_links":{"self":[{"href":"https:\/\/www.homebazaar.com\/news\/wp-json\/wp\/v2\/posts\/1271","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.homebazaar.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.homebazaar.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.homebazaar.com\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.homebazaar.com\/news\/wp-json\/wp\/v2\/comments?post=1271"}],"version-history":[{"count":0,"href":"https:\/\/www.homebazaar.com\/news\/wp-json\/wp\/v2\/posts\/1271\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.homebazaar.com\/news\/wp-json\/wp\/v2\/media\/1275"}],"wp:attachment":[{"href":"https:\/\/www.homebazaar.com\/news\/wp-json\/wp\/v2\/media?parent=1271"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.homebazaar.com\/news\/wp-json\/wp\/v2\/categories?post=1271"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.homebazaar.com\/news\/wp-json\/wp\/v2\/tags?post=1271"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}