{"id":5117,"date":"2022-06-30T10:22:39","date_gmt":"2022-06-30T10:22:39","guid":{"rendered":"https:\/\/www.homebazaar.com\/knowledge\/?p=5117"},"modified":"2024-12-27T10:55:05","modified_gmt":"2024-12-27T10:55:05","slug":"navi-mumbai-metro","status":"publish","type":"post","link":"https:\/\/www.homebazaar.com\/knowledge\/navi-mumbai-metro\/","title":{"rendered":"Navi Mumbai Metro Line- Route, Map, Fare, and Latest News"},"content":{"rendered":"<h6><b><i>Navi Mumbai Metro is expected to serve 1,00,000 passengers by 2027. The Navi Mumbai Metro will interconnect different areas for a better transport system apart from roadway and railway.\u00a0 Also, this highly anticipated infrastructure project will bring the maximum growth avenues in the Navi Mumbai region. <\/i><\/b><b><i>Check this article to know more about the Navi Mumbai Metro line route, fare, schedule, and the latest news. <\/i><\/b><b><i>\u00a0 <\/i><\/b><span style=\"font-weight: 400\">\u00a0<\/span><\/h6>\n<h2><b>Navi Mumbai Metro<\/b><\/h2>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-5123 size-full\" src=\"https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Navi-Mumbai-Metro13.jpg\" alt=\"Navi Mumbai Metro line\" width=\"774\" height=\"374\" srcset=\"https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Navi-Mumbai-Metro13.jpg 774w, https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Navi-Mumbai-Metro13-300x145.jpg 300w, https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Navi-Mumbai-Metro13-768x371.jpg 768w, https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Navi-Mumbai-Metro13-750x362.jpg 750w\" sizes=\"(max-width: 774px) 100vw, 774px\" \/><\/p>\n<p><span style=\"font-weight: 400\">Navi Mumbai Metro was planned to provide the residents with a new mode of transportation with excellent connectivity. The Navi Mumbai Metro will interconnect different areas in 3 phases which are\u00a0<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td>\n<p style=\"text-align: center\"><b>Phase\u00a0<\/b><\/p>\n<\/td>\n<td style=\"text-align: center\">\n<p style=\"text-align: center\"><b>Lines\u00a0<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">Phase 1<\/span><\/p>\n<\/td>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">Belapur-Kharghar-Taloja-Pendhar<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">Phase 2<\/span><\/p>\n<\/td>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">MIDC Taloja-Kalamboli Khandeshwar. It is suggested to extend up to NMIA<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\"><span style=\"font-weight: 400\">Phase 3<\/span><\/td>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">Interlink between phase 1 and phase 2<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400\">There will be a total of 20 metro stations in Navi Mumbai and among them, the construction of Phase 1 which is of 11 metro stations from CBD Belapur to Pendhar.\u00a0\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">The Metro project has already received the RDSO certificate and Dynamic Clearance Certificate. The next step is to get the Commissioner of Metro Railway Safety Certificate (CMRS).\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">CIDCO took the construction work of this Navi Mumbai Metro to serve around one lakh passengers by 2027. The Railway Board of Government of India has approved the stocks for CIDCO\u2019s Navi Mumbai Metro Project on 11th February 2022.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">The next process is to get approval from the Civil work inspection, the Railway Board, and the CMRS for proceeding with direct transport.\u00a0\u00a0<\/span><\/p>\n<h2><b>The Metro Project In Navi Mumbai<\/b><\/h2>\n<p><img decoding=\"async\" class=\"alignnone wp-image-5122 size-full\" src=\"https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-Project-In-Navi-Mumbai.jpg\" alt=\"Navi Mumbai Metro project\" width=\"774\" height=\"374\" srcset=\"https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-Project-In-Navi-Mumbai.jpg 774w, https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-Project-In-Navi-Mumbai-300x145.jpg 300w, https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-Project-In-Navi-Mumbai-768x371.jpg 768w, https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-Project-In-Navi-Mumbai-750x362.jpg 750w\" sizes=\"(max-width: 774px) 100vw, 774px\" \/><\/p>\n<p><span style=\"font-weight: 400\">The metro project for the entire region of Mumbai and the suburban areas is planned and developed by MMRDA. <\/span><\/p>\n<p><span style=\"font-weight: 400\">To develop a better transport system for the growing population in Mumbai, the DMRC (Delhi Metro Rail Corporation) studied how to create a feasible metro project for Navi Mumbai.\u00a0\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Initially, the master plan for the Navi Mumbai Metro rail project was launched for six metro corridors which would cover 120 KMs only. However, after the plan was revised, DMRC suggested five metro corridors only with a distance of 106.4 kilometers.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">The construction work for the finalized master plan was started in 2011 for Line 1. This plan was divided into three phases Phase 1 (Belapur &#8211; Pendhar), and the other phases were supposed to start by 2015. However, Phase 1 only took more than a decade to complete.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">The Master plan of the Metro project included the following corridors:<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td>\n<p style=\"text-align: center\"><b>Corridor\u00a0<\/b><\/p>\n<\/td>\n<td style=\"text-align: center\"><b>Length in km<\/b><\/td>\n<td style=\"text-align: center\"><b>Authority\u00a0<\/b><\/td>\n<\/tr>\n<tr>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">Belapur-Taloje-Pendhar-Khandeshwar-NMIA<\/span><\/p>\n<\/td>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">23.4\u00a0<\/span><\/p>\n<\/td>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">CIDCO\/MAHA METRO<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">Mankhurd-NMIA-Panvel<\/span><\/p>\n<\/td>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">32<\/span><\/p>\n<\/td>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">MMRDA<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">Sewree-Kharkopar-NMIA (MTHL)<\/span><\/p>\n<\/td>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">22<\/span><\/p>\n<\/td>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">MMRDA<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">Dighe-Turbhe-Belapur<\/span><\/p>\n<\/td>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">20<\/span><\/p>\n<\/td>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">NMMC<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">Vashi-Ghansoli-Mahape<\/span><\/p>\n<\/td>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">9<\/span><\/p>\n<\/td>\n<td>\n<p style=\"text-align: center\"><span style=\"font-weight: 400\">NMMC<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center\"><b>Total<\/b><\/td>\n<td style=\"text-align: center\"><b>106.4<\/b><\/td>\n<td style=\"text-align: center\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><b>Metro Rail In Navi Mumbai Route<\/b><\/h2>\n<p><img decoding=\"async\" class=\"alignnone wp-image-5124 size-full\" src=\"https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-Rail-In-Navi-Mumbai-Route1.jpg\" alt=\"Navi Mumbai Metro route\" width=\"774\" height=\"374\" srcset=\"https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-Rail-In-Navi-Mumbai-Route1.jpg 774w, https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-Rail-In-Navi-Mumbai-Route1-300x145.jpg 300w, https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-Rail-In-Navi-Mumbai-Route1-768x371.jpg 768w, https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-Rail-In-Navi-Mumbai-Route1-750x362.jpg 750w\" sizes=\"(max-width: 774px) 100vw, 774px\" \/><\/p>\n<p><span style=\"font-weight: 400\">There are 5 Line routes in Navi Mumbai Metro project and currently the work for Line 1 Phase 1 is in progress. <\/span><\/p>\n<p><span style=\"font-weight: 400\">The work for the 11.10 km distance of Line 1 started in November 2011 and it is expected that the task will be completed by early 2022.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">The detail of Navi Mumbai Metro Line 1 is provided below:<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Phase\u00a0<\/b><\/td>\n<td><b>Lines\u00a0<\/b><\/td>\n<td><b>Length in km<\/b><\/td>\n<td><b>Total stations\u00a0<\/b><\/td>\n<td><b>Type\u00a0<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">Phase 1<\/span><\/td>\n<td><span style=\"font-weight: 400\">Belapur-Kharghar-Taloja-Pendhar<\/span><\/td>\n<td><span style=\"font-weight: 400\">11.10<\/span><\/td>\n<td><span style=\"font-weight: 400\">11<\/span><\/td>\n<td><span style=\"font-weight: 400\">Elevated\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">Phase 2<\/span><\/td>\n<td><span style=\"font-weight: 400\">MIDC Taloja-Kalamboli Khandeshwar. It is suggested to extend up to NMIA<\/span><\/td>\n<td><span style=\"font-weight: 400\">10.30<\/span><\/td>\n<td><span style=\"font-weight: 400\">8<\/span><\/td>\n<td><span style=\"font-weight: 400\">Elevated\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">Phase 3<\/span><\/td>\n<td><span style=\"font-weight: 400\">Interlink between phase 1 and phase 2<\/span><\/td>\n<td><span style=\"font-weight: 400\">2.00<\/span><\/td>\n<td><span style=\"font-weight: 400\">1<\/span><\/td>\n<td><span style=\"font-weight: 400\">Elevated<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Total\u00a0<\/b><\/td>\n<td><\/td>\n<td><b>23.4<\/b><\/td>\n<td><b>20<\/b><\/td>\n<td><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><b>Metro In Navi Mumbai Map<\/b><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-5120 size-full\" src=\"https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-In-Navi-Mumbai-Map.jpg\" alt=\"Navi Mumbai Metro map\" width=\"774\" height=\"374\" srcset=\"https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-In-Navi-Mumbai-Map.jpg 774w, https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-In-Navi-Mumbai-Map-300x145.jpg 300w, https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-In-Navi-Mumbai-Map-768x371.jpg 768w, https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-In-Navi-Mumbai-Map-750x362.jpg 750w\" sizes=\"(max-width: 774px) 100vw, 774px\" \/><\/p>\n<h2><b>Navi Mumbai Metro Line 1 &#8211; Phase 1<\/b><\/h2>\n<p><span style=\"font-weight: 400\">The Mumbai Metro project for Line 1<\/span> <span style=\"font-weight: 400\">is constructed between Belapur which is in the North Navi Mumbai and Pendhar which is in South Navi Mumbai. It consists of 11 stations with 11.10 km which are fully elevated.\u00a0\u00a0<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Number of stations\u00a0<\/b><\/td>\n<td><span style=\"font-weight: 400\">11<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Route length\u00a0<\/b><\/td>\n<td><span style=\"font-weight: 400\">11.10 km<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Depot<\/b><\/td>\n<td><span style=\"font-weight: 400\">Taloja<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Estimated Cost\u00a0<\/b><\/td>\n<td><span style=\"font-weight: 400\">Rs 3063.63 cr<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Stations\u00a0<\/b><\/td>\n<td>\n<ol>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">CBD Belapur\u00a0<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Sector 7<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">CIDCO Science Park<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Utsav Chowk (Khargar)<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Sector 11<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Sector 14<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Central Park\u00a0<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Pethpada<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Sector 34<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Panchanand<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Pendhar<\/span><\/li>\n<\/ol>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><b>Metro Navi Mumbai Route Map of Line 1<\/b><\/h2>\n<p><b>The Metro map for Navi Mumbai Phase 1 Line 1 from CBD Belapur to Pendhar is provided.\u00a0<\/b><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-5121 size-full\" src=\"https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-Navi-Mumbai-Route-Map-of-Line-1.jpg\" alt=\"Navi Mumbai Metro map of line 1\" width=\"774\" height=\"374\" srcset=\"https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-Navi-Mumbai-Route-Map-of-Line-1.jpg 774w, https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-Navi-Mumbai-Route-Map-of-Line-1-300x145.jpg 300w, https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-Navi-Mumbai-Route-Map-of-Line-1-768x371.jpg 768w, https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/06\/Metro-Navi-Mumbai-Route-Map-of-Line-1-750x362.jpg 750w\" sizes=\"(max-width: 774px) 100vw, 774px\" \/><\/p>\n<h2><b>Navi Mumbai Metro Line 2<\/b><\/h2>\n<p><span style=\"font-weight: 400\">The Navi Mumbai route of Phase 2 will be from MIDC Taloja to Khandeshwar with a distance of 10.30 km including eight metro stations. This line will be the extension of Line 1<\/span><\/p>\n<p><span style=\"font-weight: 400\">The construction work of Line 2 and 3 will be provided by NMMC (Navi Mumbai Municipal Corporation), and MMRDA (Mumbai Metropolitan Region Development Authority).\u00a0<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Estimated Cost\u00a0<\/b><\/td>\n<td><span style=\"font-weight: 400\">Rs 2820.20 cr<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Length\u00a0<\/b><\/td>\n<td><span style=\"font-weight: 400\">7.12 km<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Stations\u00a0<\/b><\/td>\n<td><span style=\"font-weight: 400\">6<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Type\u00a0<\/b><\/td>\n<td><span style=\"font-weight: 400\">Elevated\u00a0<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><b>Navi Mumbai Metro Line 3<\/b><\/h2>\n<p><span style=\"font-weight: 400\">One interlink will be built between Pendhar and MIDC as Navi Mumbai Metro Line 3 under Phase 3. It is expected to be completed by January 2024. This line will be constructed between MIDC Taloje and Pendhar. It is an extension of Line 1.<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Estimated Cost\u00a0<\/b><\/td>\n<td><span style=\"font-weight: 400\">Rs 1750.14 cr<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Length\u00a0<\/b><\/td>\n<td><span style=\"font-weight: 400\">3.87 km<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Stations\u00a0<\/b><\/td>\n<td><span style=\"font-weight: 400\">3<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Type\u00a0<\/b><\/td>\n<td><span style=\"font-weight: 400\">Elevated\u00a0<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><b>Navi Mumbai Metro Line 4<\/b><\/h2>\n<p><span style=\"font-weight: 400\">This line will be completed between Khandeshwar and Navi Mumbai International Airport (NMIA). This line will be the extension of Line 1.\u00a0<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Estimated Cost\u00a0<\/b><\/td>\n<td><span style=\"font-weight: 400\">Rs 1270.17 cr<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Length\u00a0<\/b><\/td>\n<td><span style=\"font-weight: 400\">4.17 km<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Type\u00a0<\/b><\/td>\n<td><span style=\"font-weight: 400\">Elevated &amp; Underground<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><b>Navi Mumbai Metro Fare<\/b><\/h2>\n<p><span style=\"font-weight: 400\">The metro fare structure or ticket prices are kept nominal so that it is convenient for the passengers to travel.\u00a0 The fare will be lesser than the AC bus fare of NMMC mentioned by Dr. Sanjay Mukherjee, Vice-Chairman of CIDCO.\u00a0<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Distance in km<\/b><\/td>\n<td><b>Fare in Rs\u00a0<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">0 to 2<\/span><\/td>\n<td><span style=\"font-weight: 400\">10<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">2 to 4<\/span><\/td>\n<td><span style=\"font-weight: 400\">15<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">4 to 6<\/span><\/td>\n<td><span style=\"font-weight: 400\">20<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">6 to 8<\/span><\/td>\n<td><span style=\"font-weight: 400\">25<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">8 to 10<\/span><\/td>\n<td><span style=\"font-weight: 400\">30<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">Beyond 10<\/span><\/td>\n<td><span style=\"font-weight: 400\">40<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><b>Navi Mumbai Metro Latest News<\/b><\/h2>\n<h3><b>Navi Mumbai Metro News: Railway Minister approved rolling stock for Navi Mumbai Metro Work<\/b><\/h3>\n<p><span style=\"font-weight: 400\">On 11th February 2022 the railway ministry has approved train coaches and electrical systems for Metro work of Navi Mumbai.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">The Vice-Chairperson and Managing Director of CIDCO, Mr. Sanjay Mukherjee has stated that this approval was significant for the progress of metro construction work.\u00a0<\/span><\/p>\n<h3><b>Navi Mumbai Metro News: Navi Mumbai Metro Line 3 is estimated to be completed by 2024<\/b><\/h3>\n<p><span style=\"font-weight: 400\">Due to the metro car shed issue, this project was delayed resulting in cost escalation by 10,000 crore. It is estimated that the work of Navi Mumbai Metro Line 3 will be completed by 2024.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">There has been a proposal of extending the line by 2.5 km from Cuffe Parade to Navy Nagar. 27 stations will be on the line after the extension. Around Rs, 2301 crore cost is incurred additionally due to the extension.\u00a0<\/span><\/p>\n<h2><b>FAQs<\/b><\/h2>\n<table>\n<tbody>\n<tr>\n<td><b>Q1: When will the Navi Mumbai Metro Phase 1 operations start?<\/b><\/p>\n<p><b>Ans:<\/b><span style=\"font-weight: 400\"> It was decided by CIDCO that the Navi Mumbai Metro Phase 1 operations will start by early 2022.\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Q2: Has Taloja metro work started?<\/b><\/p>\n<p><b>Ans:<\/b><span style=\"font-weight: 400\"> Yes, the trial run for Taloja metro was done on 7th May 2021. It was decided to be operational by 2016.\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Q3: What will be the ticket fare in Navi Mumbai Metro?<\/b><\/p>\n<p><b>Ans:<\/b><span style=\"font-weight: 400\"> The ticket fare for Navi Mumbai Metro is provided below:<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Distance in km<\/b><\/td>\n<td><b>Fare in Rs\u00a0<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">0 to 2<\/span><\/td>\n<td><span style=\"font-weight: 400\">10<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">2 to 4<\/span><\/td>\n<td><span style=\"font-weight: 400\">15<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">4 to 6<\/span><\/td>\n<td><span style=\"font-weight: 400\">20<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">6 to 8<\/span><\/td>\n<td><span style=\"font-weight: 400\">25<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">8 to 10<\/span><\/td>\n<td><span style=\"font-weight: 400\">30<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">Beyond 10<\/span><\/td>\n<td><span style=\"font-weight: 400\">40<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/td>\n<\/tr>\n<tr>\n<td><b>Q4: Which stations are there under Line 1 in Navi Mumbai Metro?<\/b><\/p>\n<p><b>Ans:<\/b><span style=\"font-weight: 400\"> There are 11 stations under Line 1 like CBD Belapur, Sector 7, CIDCO Science Park, Utsav Chowk (Khargar), Sector 11, Sector 14, Central Park, Pethpada, Sector 34, Panchanand, and Pendhar.\u00a0<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Navi Mumbai Metro is expected to serve 1,00,000 passengers by 2027. The Navi Mumbai Metro will interconnect different areas for a better transport system apart from roadway and railway.\u00a0 Also, this highly anticipated infrastructure project will bring the maximum growth avenues in the Navi Mumbai region. Check this article to know more about the Navi [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":18270,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[432,431,429,437,438,433,434,435,436,430],"class_list":["post-5117","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-navi-mumbai","tag-metro-in-navi-mumbai-map","tag-metro-rail-in-navi-mumbai-route","tag-navi-mumbai-metro","tag-navi-mumbai-metro-fare","tag-navi-mumbai-metro-latest-news","tag-navi-mumbai-metro-line-1","tag-navi-mumbai-metro-line-2","tag-navi-mumbai-metro-line-3","tag-navi-mumbai-metro-line-4","tag-the-metro-project-in-navi-mumbai"],"_links":{"self":[{"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/posts\/5117","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/comments?post=5117"}],"version-history":[{"count":5,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/posts\/5117\/revisions"}],"predecessor-version":[{"id":9550,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/posts\/5117\/revisions\/9550"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/media\/18270"}],"wp:attachment":[{"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/media?parent=5117"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/categories?post=5117"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/tags?post=5117"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}