{"id":3215,"date":"2022-01-11T11:57:18","date_gmt":"2022-01-11T11:57:18","guid":{"rendered":"https:\/\/www.homebazaar.com\/knowledge\/?p=3215"},"modified":"2025-01-07T12:44:58","modified_gmt":"2025-01-07T12:44:58","slug":"mumbai-trans-harbour-link-mthl-complete-project-overview","status":"publish","type":"post","link":"https:\/\/www.homebazaar.com\/knowledge\/mumbai-trans-harbour-link-mthl-complete-project-overview\/","title":{"rendered":"Mumbai Trans Harbour Link (MTHL) 2024 &#8211; Complete Project Overview"},"content":{"rendered":"<h6><b><i>Upcoming Mumbai Trans Harbour Link is India&#8217;s longest sea bridge that connects Mumbai and the emerging Navi Mumbai region. The MTHL project will facilitate Mumbai- Navi Mumbai traveling within 20 mins. Also, It will accelerate the economic activities and trigger the multifaceted growth of the Navi Mumbai region. Read on to know how Mumbai Trans Harbour Link will redefine Navi Mumbai.<\/i><\/b><\/h6>\n<h2><b>Mumbai Trans Harbour Link (MTHL)<\/b><\/h2>\n<p><span style=\"font-weight: 400\">The Mumbai Trans Harbour Link will be India&#8217;s longest sea link providing faster connectivity between Mumbai and Navi Mumbai cities through a 21.8 km six-lane bridge across Mumbai Bay. The MTHL connecting Chirle, Navi Mumbai to Sewri in Mumbai, will accelerate the economic growth in the Navi Mumbai region.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Predominantly, the real estate market will benefit from the improved connectivity option of Mumbai Trans Harbour Link. The MTHL will boost the emerging micro-markets in Navi Mumbai and trigger the multifaceted growth of the entire region.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Expected to be completed by 2023, MTHL remains one of the main infrastructure projects that will transform Navi Mumbai.\u00a0<\/span><\/p>\n<h2><span data-preserver-spaces=\"true\">Overview: Mumbai Trans Harbour Link (MTHL)<\/span><\/h2>\n<div class=\"center\">\n<p>On the Mumbai side, the MTHL will start from the point where Worli-Sewri link Connector and the eastern freeway meet.<\/p>\n<\/div>\n<p><span data-preserver-spaces=\"true\">On the mainland side, the bridge will connect to the NH4B via a cloverleaf interchange. By using NH4B, JNPT (South Side) and Panvel (North Side) can be reached. Also, the MTHL will be connected to the Mumbai Goa road NH17 and Mumbai Pune expressway. Also, the road extension connecting Chirle to Mumbai Goa Highway and Mumbai Pune Expressway is under planning.\u00a0<\/span><\/p>\n<h2><strong>Why Mumbai Trans Harbour Sea Link Is Important For Navi Mumbai?<\/strong><\/h2>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-3220 size-full\" src=\"https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/01\/MTHSL1.png\" alt=\"Mumbai Trans Harbour Link\" width=\"704\" height=\"340\" srcset=\"https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/01\/MTHSL1.png 704w, https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/01\/MTHSL1-300x145.png 300w\" sizes=\"(max-width: 704px) 100vw, 704px\" \/><\/p>\n<p><span style=\"font-weight: 400\">Currently, the two bridges mainly the Thane Creek bridge or Vashi bridge and the Airoli bridge provide connectivity to Mumbai from the Navi Mumbai region. Both of these bridges will soon reach the saturation point and will not cope up with the increasing economic activities.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Secondly, the new economic development projects in the Navi Mumbai regions would need more robust integration with the Mumbai city. Following are some of the development plans and projects that will get the benefit from the MTHL Project.<\/span><\/p>\n<ul>\n<li><span style=\"font-weight: 400\">Navi Mumbai International Airport<\/span><\/li>\n<li><span style=\"font-weight: 400\">Navi Mumbai Integrated Special Economic Zone (SEZ)\u00a0<\/span><\/li>\n<li><span style=\"font-weight: 400\">CBD \u2013 Taloja-Khandeshwar-ring metro\u00a0<\/span><\/li>\n<li><span style=\"font-weight: 400\">Trans Thane Creek Industrial Area\u00a0<\/span><\/li>\n<li><span style=\"font-weight: 400\">Thane-Vashi, Thane-Nerul and Nerul-Uran Rail link\u00a0<\/span><\/li>\n<li><span style=\"font-weight: 400\">New container terminals at Jawaharlal Nehru Port Trust at Nhava Sheva\u00a0<\/span><\/li>\n<\/ul>\n<h2><b>Impact of Mumbai Trans Harbour Link (MTHL) On Navi Mumbai<\/b><\/h2>\n<p><img decoding=\"async\" class=\"alignnone wp-image-3218 size-full\" src=\"https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/01\/Impact-of-Mumbai-Trans-Harbour-Link-On-Navi-Mumbai.jpg\" alt=\"Impact of Mumbai Trans Harbour Link (MTHL) On Navi Mumbai\" width=\"704\" height=\"340\" srcset=\"https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/01\/Impact-of-Mumbai-Trans-Harbour-Link-On-Navi-Mumbai.jpg 704w, https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/01\/Impact-of-Mumbai-Trans-Harbour-Link-On-Navi-Mumbai-300x145.jpg 300w\" sizes=\"(max-width: 704px) 100vw, 704px\" \/><\/p>\n<h3><b>Fast-Track Growth of Navi Mumbai<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The Mumbai Trans Harbor Link project will bring rapid development to Navi Mumbai as the major developed industrial regions in Mumbai can be easily reached via MTHL.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The project will accelerate the economic activities in Navi Mumbai and boost the southern region of Navi Mumbai that has the highest potential for development.\u00a0<\/span><\/p>\n<h3><b>Improved Connectivity<\/b><\/h3>\n<p><span style=\"font-weight: 400\">Mumbai Trans Harbour Link will provide the most effective connectivity option between Mumbai and Navi Mumbai. The existing Panvel Sion Road is the busiest road that connects to Mumbai City. However, the road gets continuous traffic congestions, and therefore, needs a solid alternative.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">With the Mumbai Trans Harbour Link, the traveling time that currently takes 2 hours to reach Mumbai will be reduced to only 15-20 mins.\u00a0<\/span><\/p>\n<h3><b>Industrial Growth<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The Mumbai Trans Harbour Link road will enable easy access to Mumbai and Navi Mumbai industrial zones. The reduced traveling time to Navi Mumbai will allow the industries to settle in the affordable Navi Mumbai region.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Furthermore, MTHL will facilitate access to the Navi Mumbai International Airport. This proximity to the Navi Mumbai International Airport will play an important role in establishing multi-national companies in Navi Mumbai.\u00a0<\/span><\/p>\n<h3><b>Property Price Appreciation<\/b><\/h3>\n<p><span style=\"font-weight: 400\">There is an upward trend for the properties in Navi Mumbai. This upward trend will continue with the upcoming Mumbai Trans Harbour Link infrastructure project.\u00a0\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">The property buyers have shown keen interest in investing in the residential properties in Navi Mumbai. The open green spaces, peaceful neighborhoods, and quality residential projects in Navi Mumbai are some of the key factors that drive the real estate market in Navi Mumbai.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">So, with the advent of MTHL, people working in the employment hubs in Mumbai will become inclined to buy properties in the Navi Mumbai region because of the reduced traveling time.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Also, the commercial properties will benefit the Mumbai Trans Harbour Link Road as the companies prefer Navi Mumbai due to the affordability and the proximity to Navi Mumbai International Airport.\u00a0<\/span><\/p>\n<h2><strong>Mumbai Trans Harbour Link- (Nhava Sheva Sea Link) Project Details<\/strong><\/h2>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">The Total length of the Mumbai Trans Harbour Link is 21.8km with 6 Lane Road Bridge.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">The Intelligence Transport System, Interchanges, and Ramp are the key features of the MTHL.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">One interchange will be in Chirle, Navi Mumbai. Whereas, Mumbai side will have two interchanges at Shivaji Nagar and Chirle.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Variable message signs (VMS) to guide and provide the necessary information.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">The Sea Link is designed by considering the speed of 100 km\/hr.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Noise and View Barriers will be located at the important points.\u00a0<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">To avoid the ecological impacts, Orthotropic steel decks will be used instead of still cables. These OSDs will be fabricated in South Korea, Taiwan, Myanmar, and Japan.<\/span><\/li>\n<\/ul>\n<table>\n<tbody>\n<tr>\n<td><span style=\"font-weight: 400\">Project Cost<\/span><\/td>\n<td><span style=\"font-weight: 400\">Rs. 17,843 crore<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">Completion Date<\/span><\/td>\n<td><span style=\"font-weight: 400\">2023<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">Total Lenth<\/span><\/td>\n<td><span style=\"font-weight: 400\">21.80 km<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">Connections<\/span><\/td>\n<td><span style=\"font-weight: 400\">Sewri (Mumbai Side)Side-\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Chirle (Navi Mumbai) Side<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">Govt authority<\/span><\/td>\n<td><span style=\"font-weight: 400\">Mumbai Metropolitan Region Development Authority (MMRDA)<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">Contractors<\/span><\/td>\n<td><span style=\"font-weight: 400\">Package 1- Larsen and Toubro \u2013 IHI Corporation J<\/span><\/p>\n<p><span style=\"font-weight: 400\">Package 2- Daewoo E&amp;C \u2013 Tata Projects Limited JV<\/span><\/p>\n<p><span style=\"font-weight: 400\">Package 3-Larsen and Toubro<\/span><\/p>\n<p><span style=\"font-weight: 400\">Package 4- In Process<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h5><strong>MTHL Daily Traffic Distribution<\/strong><\/h5>\n<table>\n<tbody>\n<tr>\n<td><b>Year<\/b><\/td>\n<td><b>Between Sewri Interchange and Shivaji Nagar Interchange<\/b><\/td>\n<td><b>Between Shivaji Nagar Interchange &#8211; Chirle Interchange<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">2023<\/span><\/td>\n<td><span style=\"font-weight: 400\">39,300<\/span><\/td>\n<td><span style=\"font-weight: 400\">9,800<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">2032<\/span><\/td>\n<td><span style=\"font-weight: 400\">103,900<\/span><\/td>\n<td><span style=\"font-weight: 400\">29,600<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">2042<\/span><\/td>\n<td><span style=\"font-weight: 400\">145,500<\/span><\/td>\n<td><span style=\"font-weight: 400\">55,000<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><b>Mumbai Trans Harbour Link (MTHL) Project Implementation.<\/b><\/h2>\n<p><img decoding=\"async\" class=\"alignnone wp-image-3219 size-full\" src=\"https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/01\/Mumbai-Trans-Harbour-Link-Project-Implementation..png\" alt=\"Mumbai Trans Harbour Link (MTHL) Project Status\" width=\"704\" height=\"340\" srcset=\"https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/01\/Mumbai-Trans-Harbour-Link-Project-Implementation..png 704w, https:\/\/www.homebazaar.com\/knowledge\/wp-content\/uploads\/2022\/01\/Mumbai-Trans-Harbour-Link-Project-Implementation.-300x145.png 300w\" sizes=\"(max-width: 704px) 100vw, 704px\" \/><\/p>\n<p><span style=\"font-weight: 400\">The Mumbai Trans Harbour Link Project will be implemented in 4 packages.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">As of January 2022, 70% of the MTHL construction work has been done.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">On <\/span><span style=\"font-weight: 400\">Jan 3, 2022<\/span><span style=\"font-weight: 400\">the MMRDA launched India\u2019s first Orthotropic Steel Deck (OSD) on MTHL.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Following are the details for the 4 packages and the construction details it involves-<\/span><\/p>\n<p><b>Package 1-<\/b><\/p>\n<p><span style=\"font-weight: 400\">Construction of Sewri Interchange<\/span><\/p>\n<p><span style=\"font-weight: 400\">Construction of 10.38 Km Long Bridge<\/span><\/p>\n<p><b>Package 2-<\/b><\/p>\n<p><span style=\"font-weight: 400\">Construction of Shivaji Nagar Interchange<\/span><\/p>\n<p><span style=\"font-weight: 400\">Construction of 7.807 km long\u00a0<\/span><\/p>\n<p><b>Package 3-<\/b><\/p>\n<p><span style=\"font-weight: 400\">Construction of 3.613km long via duct section<\/span><\/p>\n<p><span style=\"font-weight: 400\">Construction of Interchange on National Highway-4B, and State Highway-54.\u00a0<\/span><\/p>\n<p><b>Package 4-<\/b><\/p>\n<p><span style=\"font-weight: 400\">Developing the Transport Management System, installation equipment called as Intelligent Transport Systems (ITS)<\/span><\/p>\n<blockquote><p><b><i>MMRDA is checking the technical feasibility of a metro transit system on the MTHL. It will enable rapid public transport between Mumbai and Navi Mumbai. Also, MMRDA is planning for the dedicated bus lanes on the Mumbai Trans Harbour Link.\u00a0<\/i><\/b><\/p><\/blockquote>\n<h2>FAQs<\/h2>\n<table>\n<tbody>\n<tr>\n<td><b>What is MTHL Infrasture Project?<\/b><\/p>\n<p><span style=\"font-weight: 400\">Mumbai Trans Harbour Link (MTHL) is India\u2019s longest sea link that will connect Mumbai (Sweri) and Navi Mumbai (Chirle) cities. MTHL will play a major role in boosting the Navi Mumbai economy by providing a robust economic corridor between Mumbai- Navi Mumbai.<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>What is the Lenth of Nhava Sheva Sea Link?\u00a0<\/b><\/p>\n<p><span style=\"font-weight: 400\">The Mumbai Trans Harbour Link (MTHL) at Nhava Sheva Sea link has a total length of 21.8 Km connecting Sewri at Mumbai and Chirle at Navi Mumbai.\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>When will the Mumbai Trans Harbour Link Raod be Completed?<\/b><\/p>\n<p><span style=\"font-weight: 400\">The Mumbai Trans Harbour Link (MTHL) is expected to be completed by 2023. The constriction of MTHL is taken under the 4 different packages.\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>What is the total project cost of MTHL?<\/b><\/p>\n<p><span style=\"font-weight: 400\">According to the Mumbai Metropolitan Region Development Authority (MMRDA), the cost of the MTHL project is Rs. 17,843 crore<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Why MTHL is important for Navi Mumbai?<\/b><\/p>\n<p><span style=\"font-weight: 400\">The upcoming MTHL will boost the overall connectivity of the Navi Mumbai regions and bring the development avenues for the region by creating a strong economic corridor between Mumbai-Navi Mumbai.<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Which is the longest sea link in India?<\/b><\/p>\n<p><span style=\"font-weight: 400\">Mumbai Trans Harbour Link is India\u2019s longest sea link with a total 21.8 Km length. The project is considered environmentally friendly and is expected to be completed by 2023.\u00a0\u00a0<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Upcoming Mumbai Trans Harbour Link is India&#8217;s longest sea bridge that connects Mumbai and the emerging Navi Mumbai region. The MTHL project will facilitate Mumbai- Navi Mumbai traveling within 20 mins. Also, It will accelerate the economic activities and trigger the multifaceted growth of the Navi Mumbai region. Read on to know how Mumbai Trans [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":18561,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11,13],"tags":[192,193,191,33],"class_list":["post-3215","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mumbai","category-navi-mumbai","tag-mthl","tag-mumbai","tag-mumbai-trans-harbour-link","tag-navi-mumbai"],"_links":{"self":[{"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/posts\/3215","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/comments?post=3215"}],"version-history":[{"count":16,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/posts\/3215\/revisions"}],"predecessor-version":[{"id":14735,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/posts\/3215\/revisions\/14735"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/media\/18561"}],"wp:attachment":[{"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/media?parent=3215"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/categories?post=3215"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/tags?post=3215"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}