{"id":11751,"date":"2023-04-04T10:57:14","date_gmt":"2023-04-04T10:57:14","guid":{"rendered":"https:\/\/www.homebazaar.com\/knowledge\/?p=11751"},"modified":"2024-11-20T12:18:00","modified_gmt":"2024-11-20T12:18:00","slug":"top-5-upcoming-infrastructure-projects-in-mumbai","status":"publish","type":"post","link":"https:\/\/www.homebazaar.com\/knowledge\/top-5-upcoming-infrastructure-projects-in-mumbai\/","title":{"rendered":"Upcoming Infrastructure Projects in Mumbai 2025"},"content":{"rendered":"<h2><b>Airoli Katai Naka Freeway<\/b><b><\/b><\/h2>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-11752 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101619\/Airoli-Katai-Naka-Freeway.jpg\" alt=\"Upcoming Infrastructure Projects in Mumbai 2025 - Airoli Katai Naka Freeway\" width=\"810\" height=\"391\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101619\/Airoli-Katai-Naka-Freeway.jpg 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101619\/Airoli-Katai-Naka-Freeway-300x145.jpg 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101619\/Airoli-Katai-Naka-Freeway-768x371.jpg 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101619\/Airoli-Katai-Naka-Freeway-750x362.jpg 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<p><span style=\"font-weight: 400\">The Airoli Katai Naka freeway is the 12.30 km elevated 6-lane road project supervision under MMRDA.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">This highway will be connecting the Airoli bridge to Parsik to Shilpata to Katai Naka in Maharashtra.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The estimated cost of the project is Rs. 944 crores.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The separation of the Airoli Katai Naka freeway project construction into 3 phases is been defined as\u00a0<\/span><\/p>\n<ul>\n<li><b>Phase 1 <\/b><span style=\"font-weight: 400\">holds 5.2 km. This road will be between Thane Belapur road &amp; NH-48 near the Mumbra bypass. Out of 5.2 km, a 3.5 km section is under NH-48 &amp; remaining 1.7km tunnel will be passing through Parsik hill.<\/span><\/li>\n<li><b>Phase 2 <\/b><span style=\"font-weight: 400\">holds 2.2 km is an elevated road passing towards the east end of the Airoli bridge.<\/span><\/li>\n<li><b>Phase 3 <\/b><span style=\"font-weight: 400\">holds a 6.3 km road constructed between NH-48 &amp; Katai Naka. And it is parallel to the Diva-Pavel railway line.<\/span><\/li>\n<\/ul>\n<h3><b>Current Status Of Airoli Katai Naka Freeway<\/b><\/h3>\n<p><span style=\"font-weight: 400\">Being listed among one of the looked-after upcoming infrastructure projects in Mumbai, the Airoli Katai Naka freeway has elevated roads &amp; tunnel is under construction since 2019.<\/span><\/p>\n<h3><b>Completion Date Of Airoli Katai Naka Freeway<\/b><\/h3>\n<p><span style=\"font-weight: 400\">Phase 2 of the Airoli Katai Naka Freeway project is been planned to be ready for operations in 2023.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Once the entire project is completed, the travelers between Mumbai, Kalyan &amp; Badlapur Industrial estate will be mostly benefitted from this freeway.<\/span><\/p>\n<p><span style=\"font-weight: 400\">So, the Airoli Katai Naka Freeway project&#8217;s estimated deadline is set for <\/span><b>2024<\/b><span style=\"font-weight: 400\">.<\/span><\/p>\n<p><span style=\"font-weight: 400\">To know the complete details about the project check out <\/span><a href=\"https:\/\/www.homebazaar.com\/knowledge\/airoli-katai-naka-freeway\/\"><span style=\"font-weight: 400\">Airoli Katai Naka Freeway Project 2024 &#8211; Details, Status, and Latest Updates<\/span><\/a><span style=\"font-weight: 400\">\u00a0<\/span><\/p>\n<h3><b>Impact On Real Estate<\/b><\/h3>\n<p><span style=\"font-weight: 400\">Over the completion of the <\/span><span style=\"font-weight: 400\">Airoli Katai Naka Freeway project, the development of educational institutes, malls, commercial buildings, etc will be seen in the main locations across the roadway.<\/span><\/p>\n<p><span style=\"font-weight: 400\">And <\/span><a href=\"https:\/\/www.homebazaar.com\/properties-in-navi-mumbai-mumbai\"><span style=\"font-weight: 400\">properties in Navi Mumbai<\/span><\/a><span style=\"font-weight: 400\"> &amp; <a href=\"https:\/\/www.homebazaar.com\/properties-in-dombivali-mumbai\">real estate in <\/a><\/span><a href=\"https:\/\/www.homebazaar.com\/properties-in-dombivali-mumbai\"><span style=\"font-weight: 400\">Dombivli<\/span><\/a><span style=\"font-weight: 400\">\u00a0will be experiencing major real estate benefits as growth in property rates.<\/span><\/p>\n<h2><b>Navi Mumbai International Airport<\/b><\/h2>\n<p><img decoding=\"async\" class=\"alignnone wp-image-11753 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101656\/Navi-Mumbai-International-Airport.jpg\" alt=\"Upcoming Infrastructure Projects in Mumbai 2025 - Navi Mumbai International Airport\" width=\"810\" height=\"391\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101656\/Navi-Mumbai-International-Airport.jpg 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101656\/Navi-Mumbai-International-Airport-300x145.jpg 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101656\/Navi-Mumbai-International-Airport-768x371.jpg 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101656\/Navi-Mumbai-International-Airport-750x362.jpg 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<p><span style=\"font-weight: 400\">A new airport called the Navi Mumbai International Airport will be constructed on a vast land of 1160 hectares located in the eastern Raigad district of Mumbai.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">The airport will be linked to the Chhatrapati Shivaji Maharaj International Airport through a metro line.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">And it will also be in proximity to Mumbai through the Mumbai Trans Harbour Link project that is currently under construction.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">The airport will be capable of handling 10 million passengers annually upon the completion of its first phase, and its capacity will increase to 25 million and 60 million passengers after the second and final phases, respectively.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">The estimated cost of the project is Rs. 16700 crores.<\/span><\/p>\n<h3><b>Current Status Of Navi Mumbai International Airport<\/b><\/h3>\n<p><span style=\"font-weight: 400\">Navi Mumbai International Airport is currently one of the upcoming infrastructure projects in Mumbai and it is still under construction.<\/span><\/p>\n<h3><b>Completion Date Of Navi Mumbai International Airport<\/b><\/h3>\n<p><span style=\"font-weight: 400\">Initially, it was scheduled that the 1st phase of this project would conclude in <strong>July 2024<\/strong>.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">However, the latest update indicates that the first and second phases are being merged, and the construction of both phases is now expected to finish in <strong>March 2025<\/strong><\/span><span style=\"font-weight: 400\">.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">The opening ceremony of the Navi Mumbai International Airport was set to take place in <strong>November 2024<\/strong>.<\/span><\/p>\n<p><span style=\"font-weight: 400\">To know the complete details about the project check out <\/span><a href=\"https:\/\/www.homebazaar.com\/knowledge\/official-first-look-of-navi-mumbai-international-airport\/\"><span style=\"font-weight: 400\">Navi Mumbai International Airport<\/span><\/a><\/p>\n<p><a href=\"https:\/\/www.homebazaar.com\/knowledge\/official-first-look-of-navi-mumbai-international-airport\/\"><span style=\"font-weight: 400\">Project 2024<\/span><\/a><span style=\"font-weight: 400\">.<\/span><\/p>\n<h3><b>Impact On Real Estate<\/b><\/h3>\n<p><span style=\"font-weight: 400\">Upon the completion of the Navi Mumbai International Airport, real estate prices in the area are expected to appreciate by approximately 10 to 20%.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">This appreciation will be particularly beneficial for <\/span><a href=\"https:\/\/www.homebazaar.com\/properties-in-panvel-mumbai\"><span style=\"font-weight: 400\">properties in Panvel<\/span><\/a><span style=\"font-weight: 400\">, Kamothe, Ulwe, Taloja, Kharghar, and other nearby locations.<\/span><\/p>\n<h2><b>Mumbai Metro<\/b><\/h2>\n<p><img decoding=\"async\" class=\"alignnone wp-image-11754 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101729\/Mumbai-Metro.jpg\" alt=\"Upcoming Infrastructure Projects in Mumbai 2025 - Mumbai Metro\" width=\"810\" height=\"391\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101729\/Mumbai-Metro.jpg 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101729\/Mumbai-Metro-300x145.jpg 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101729\/Mumbai-Metro-768x371.jpg 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101729\/Mumbai-Metro-750x362.jpg 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<p><span style=\"font-weight: 400\">The Mumbai Metro project is a total of 337 km master plan divided into 10 lines. And these 10 lines are separated into 17 sections.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Out of those 17 sections, Maha Mumbai Metro Operation corporation (MMMOCL) plans to initially operate two of its Metro Lines. Those are Line 2A and Line 7.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Line 2A will cover a distance of 18.6 km and consist of 17 stations, running from Dahisar to D. N. Nagar.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Line 7, on the other hand, will run from Dahisar (E) to Andheri (E) covering a distance of 16.5 km and comprising 13 stations.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">To provide passengers with ease and punctuality, a total of 44 train sets with 6 coaches each, manufactured using the &#8220;Make in India&#8221; concept, will be deployed.<\/span><\/p>\n<p><span style=\"font-weight: 400\">MMMOCL will introduce driverless metro trains equipped with GoA 4 technology, which can accommodate a maximum number of passengers and come with fully air-conditioned coaches.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">In addition, all stations will feature solar panels and CBTC signaling systems to ensure passenger safety and reduce travel time.<\/span><\/p>\n<h3><b>Current Status Of Mumbai Metro<\/b><\/h3>\n<p><span style=\"font-weight: 400\">Currently, metro line 1, 2A &amp; 7 are fully operating from 2oth February, 23. And lines 2B, 3, 4, 5, &amp; 6 are under construction. Lines 8, 11, 12, 13, &amp; 14 are the proposed lines.<\/span><\/p>\n<h3><b>Completion Date Of Mumbai Metro<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The Mumbai metro project is being constructed in 3 phases. And overall completion of the Mumbai metro construction is estimated to be in <\/span><b>October 2026<\/b><span style=\"font-weight: 400\">.<\/span><\/p>\n<p>And currently, this is one of the most awaited upcoming infrastructure projects in Mumbai.<\/p>\n<h3><b>Impact On Real Estate<\/b><\/h3>\n<p><span style=\"font-weight: 400\">Thus far, the Mumbai Metro has had a positive impact on the prices of <\/span><a href=\"https:\/\/www.homebazaar.com\/properties-in-mumbai\"><span style=\"font-weight: 400\">property in Mumbai <\/span><\/a><span style=\"font-weight: 400\">due to its enhanced connectivity and amenities, as well as reduced travel time on the roads.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Experts in the real estate industry predict that the metro will continue to shape property price trends in various localities and influence real estate prices in Mumbai.<\/span><\/p>\n<h2><b>Versova Bandra Sea Link<\/b><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-11755 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101927\/Versova-Bandra-Sea-Link.jpg\" alt=\"Upcoming Infrastructure Projects in Mumbai 2024 - Versova Bandra Sea Link\" width=\"810\" height=\"391\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101927\/Versova-Bandra-Sea-Link.jpg 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101927\/Versova-Bandra-Sea-Link-300x145.jpg 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101927\/Versova-Bandra-Sea-Link-768x371.jpg 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101927\/Versova-Bandra-Sea-Link-750x362.jpg 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<p><span style=\"font-weight: 400\">Multiple upcoming infrastructure projects in Mumbai are currently in progress, among which the Versova Bandra Sea Link (VBSL) stands at top of the list.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">This project involves the construction of a new sea link bridge that will connect Nani Nani park at the Versova location to Bandra in the present Bandra-Worli sea link, with additional connections at Juhu-Koliwada and Otter\u2019s club to maximize connectivity to various locations.<\/span><\/p>\n<p><span style=\"font-weight: 400\">To ensure the safety of travelers, the VBSL will be equipped with various facilities such as traffic monitoring systems, emergency rescue systems, bus bays with shelters, street lights, and noise barriers.<\/span><\/p>\n<h3><b>Current Status Of Versova Bandra Sea Link<\/b><\/h3>\n<p><span style=\"font-weight: 400\">At present, the Versova Bandra sea link project is still under construction.<\/span><\/p>\n<h3><b>Versova Bandra Sea Link Completion Date<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The expected date of completion for the construction of the Versova Bandra Sea Link has been rescheduled to <\/span><b>December 2026<\/b><span style=\"font-weight: 400\">.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Additionally, the estimated date for the planned defect liability period has been set to <strong>December 2028<\/strong>.<\/span><\/p>\n<p><span style=\"font-weight: 400\">To know the complete details about the project check out <\/span><a href=\"https:\/\/www.homebazaar.com\/knowledge\/versova-bandra-sea-link-completion-date-current-status-and-map\/\"><span style=\"font-weight: 400\">Versova Bandra Sea Link 2024: Project Completion Date, Current Status, and Map<\/span><\/a><\/p>\n<h3><b>Impact On Real Estate<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The upcoming Versova Bandra Sea Link is anticipated to create opportunities for real estate growth in the vicinity of Versova, including areas such as Kandivali, Borivali, Mira Road, and others.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Already, the project has a positive impact on the prices of <\/span><a href=\"https:\/\/www.homebazaar.com\/properties-in-andheri-mumbai\"><span style=\"font-weight: 400\">properties in Andheri<\/span><\/a><span style=\"font-weight: 400\">, as well as in nearby regions like Goregaon, Kandivali, and <\/span><a href=\"https:\/\/www.homebazaar.com\/properties-in-borivali-mumbai\"><span style=\"font-weight: 400\">Borivali real estate<\/span><\/a><span style=\"font-weight: 400\">.<\/span><\/p>\n<h2><b>Mumbai Coastal Road<\/b><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-11756 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101958\/Mumbai-Coastal-Road.jpg\" alt=\"Upcoming Infrastructure Projects in Mumbai 2025 - Mumbai Coastal Road\" width=\"810\" height=\"391\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101958\/Mumbai-Coastal-Road.jpg 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101958\/Mumbai-Coastal-Road-300x145.jpg 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101958\/Mumbai-Coastal-Road-768x371.jpg 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/04\/04101958\/Mumbai-Coastal-Road-750x362.jpg 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<p><span style=\"font-weight: 400\">The Mumbai Coastal Road project spans a total length of 29.20 kilometers, providing a much-needed solution to the typical two-hour travel time between South Mumbai and Western Mumbai by reducing it to just 40 minutes.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">The route will comprise several components such as bridges, tunnels, culverts, interchanges, landfilled roads, and eight lanes across the roadway. The project has acquired 186 hectares of land.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Being waited as one of the upcoming infrastructure projects in Mumbai is expected to bring a host of benefits. Such as a reduction of travel time by 70%, efficient road connectivity, a 34% reduction in daily fuel consumption, a decrease in city traffic, and real estate development, among others. The project&#8217;s closest localities are Marine Drive, Mahalaxmi, &amp; Worli.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The estimated cost of this upcoming Mumbai Coastal Road project is Rs. 12000 crores.<\/span><\/p>\n<h3><b>Mumbai Coastal Road Current Status<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The Mumbai Coastal Road project is separated into northern and southern segments. Currently, the southern portion of the project, stretching from Princess Street flyover to already established Bandra Worli Sea Link is almost 70% completed.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">This information was verified by a senior official from the Mumbai Metro Corporation.<\/span><\/p>\n<h3><b>Mumbai Coastal Road Completion Date<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The Mumbai coastal road project is expected to be completed by <strong>December<\/strong><\/span><b> 2024<\/b><span style=\"font-weight: 400\">. And for more detailed information check out <\/span><a href=\"https:\/\/www.homebazaar.com\/knowledge\/mumbai-coastal-road-map-current-status-and-latest-update\/\"><span style=\"font-weight: 400\">Mumbai Coastal Road 2024 \u2013 Map, Current Status, and Latest Update<\/span><\/a><\/p>\n<h3><b>Impact On Real Estate<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The upcoming Mumbai Coastal Road project is anticipated to have a significant impact on the growth of housing demand in nearby suburbs, leading to a rise in property prices.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Recent reports suggest that the project has already caused property prices to appreciate by 5 to 15 percent.<\/span><\/p>\n<p><span style=\"font-weight: 400\">In the future, the project is expected to benefit property markets in several areas, including <\/span><span style=\"font-weight: 400\">Borivali<\/span><span style=\"font-weight: 400\">, Dahisar, Bandra, Goregaon, Bhayandar, Mira Road, Andheri, and <\/span><a href=\"https:\/\/www.homebazaar.com\/properties-in-kandivali-mumbai\"><span style=\"font-weight: 400\">property in Kandivali<\/span><\/a><span style=\"font-weight: 400\">.<\/span><\/p>\n<h2><b>FAQs<\/b><\/h2>\n<table>\n<tbody>\n<tr>\n<td><b>Which are the upcoming infrastructure projects in Mumbai?<\/b><\/p>\n<p><span style=\"font-weight: 400\">Airoli Katai Naka freeway, <\/span><span style=\"font-weight: 400\">Navi Mumbai International Airport, <\/span><span style=\"font-weight: 400\">Mumbai Metro, <\/span><span style=\"font-weight: 400\">Versova Bandra Sea Link &amp; <\/span><span style=\"font-weight: 400\">Mumbai Coastal Road projects are the looked-after upcoming infrastructure projects in Mumbai.<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Is the Navi Mumbai International airport project completed?<\/b><\/p>\n<p><span style=\"font-weight: 400\">No. Navi Mumbai International airport project is expected to be completed by March<\/span><span style=\"font-weight: 400\">\u00a02025.<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>How Mumbai Coastal road is impacting real estate?<\/b><\/p>\n<p><span style=\"font-weight: 400\">As the Mumbai coastal road project is in progress, it has already impacted the real estate sector by 5 to 15% property price appreciation at the surrounding localities.<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>What is the Current Status Of Airoli Katai Naka Freeway?<\/b><\/p>\n<p><span style=\"font-weight: 400\">The current status of the Airoli Katai Naka freeway project is still under construction.<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Airoli Katai Naka Freeway The Airoli Katai Naka freeway is the 12.30 km elevated 6-lane road project supervision under MMRDA.\u00a0 This highway will be connecting the Airoli bridge to Parsik to Shilpata to Katai Naka in Maharashtra. The estimated cost of the project is Rs. 944 crores. The separation of the Airoli Katai Naka freeway [&hellip;]<\/p>\n","protected":false},"author":12,"featured_media":11757,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[415],"tags":[2408,2407,34,3478,1805],"class_list":["post-11751","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-guides-2","tag-mumbai-coastal-road","tag-mumbai-metro","tag-navi-mumbai-international-airport","tag-top-5-upcoming-infrastructure-projects-in-mumbai-2025","tag-versova-bandra-sea-link"],"_links":{"self":[{"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/posts\/11751","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/comments?post=11751"}],"version-history":[{"count":6,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/posts\/11751\/revisions"}],"predecessor-version":[{"id":16906,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/posts\/11751\/revisions\/16906"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/media\/11757"}],"wp:attachment":[{"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/media?parent=11751"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/categories?post=11751"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/tags?post=11751"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}