{"id":11300,"date":"2023-03-08T13:24:32","date_gmt":"2023-03-08T13:24:32","guid":{"rendered":"https:\/\/www.homebazaar.com\/knowledge\/?p=11300"},"modified":"2025-01-08T13:01:03","modified_gmt":"2025-01-08T13:01:03","slug":"top-8-upcoming-infrastructure-projects-in-india","status":"publish","type":"post","link":"https:\/\/www.homebazaar.com\/knowledge\/top-8-upcoming-infrastructure-projects-in-india\/","title":{"rendered":"Latest Upcoming Infrastructure Projects in India 2025"},"content":{"rendered":"<h2><b>Bharatmala Pariyojana<\/b><\/h2>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-11310 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123918\/Roadways-extra.jpg\" alt=\"Upcoming Infrastructure Projects in India 2025 - Bharatmala Pariyojana\" width=\"810\" height=\"391\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123918\/Roadways-extra.jpg 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123918\/Roadways-extra-300x145.jpg 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123918\/Roadways-extra-768x371.jpg 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123918\/Roadways-extra-750x362.jpg 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<p><span style=\"font-weight: 400\">The <\/span><a href=\"https:\/\/morth.nic.in\/sites\/default\/files\/Bharat%20Mala.pdf\" rel=\"nofollow noopener\" target=\"_blank\"><span style=\"font-weight: 400\">Bharatmala Pariyojana<\/span><\/a> <span style=\"font-weight: 400\">is said to be the second-largest highway project in India. And National Highways Development project is the first one on the list.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The prime focus of the Bharatmala Pariyojana construction is to optimize the efficiency of the movement of goods and people across India.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The project will be connecting 550 districts through NH linkages across the country.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Bharatmala Pariyojana is aimed to unite remote areas and satellite cities such as Pune, Bangalore, Hyderabad, etc.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The project suggests the highway will pass through Gujarat, Maharashtra, Rajasthan, Haryana, &amp; Punjab.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Further, the route will get linked to Himalayan territories such as Jammu Kashmir, Uttarakhand, &amp; Himachal Pradesh.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Uttar Pradesh, Bihar, West Bengal, Terai, Sikkim, Arunachal Pradesh, Assam, etc. are also connected over the highway route.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The impact of Bharatmala Pariyojana will boost the highway infrastructure by raising 6 NC corridors to 50 corridors, &amp; 40% of freight to 80% of freight operations on National highways.<\/span><\/p>\n<p><span style=\"font-weight: 400\">This project is one of the most significant among upcoming infrastructure projects in India.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The total length of the Bharatmala Pariyojana is 83677 km. This is divided into two construction phases like<\/span><\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-11304 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123248\/Top-8-Upcoming-Infrastructure-Projects-in-India-2023_Image-On-7th-page.jpg\" alt=\"Upcoming Infrastructure Projects in India 2025 - Bharatmala Pariyojana\" width=\"810\" height=\"685\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123248\/Top-8-Upcoming-Infrastructure-Projects-in-India-2023_Image-On-7th-page.jpg 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123248\/Top-8-Upcoming-Infrastructure-Projects-in-India-2023_Image-On-7th-page-300x254.jpg 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123248\/Top-8-Upcoming-Infrastructure-Projects-in-India-2023_Image-On-7th-page-768x649.jpg 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123248\/Top-8-Upcoming-Infrastructure-Projects-in-India-2023_Image-On-7th-page-750x634.jpg 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Phase 1<\/b><span style=\"font-weight: 400\">: 34800 km<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">Phase 1 was expected to be completed by December 2022. But due to the issues such as land acquisition, multiple Covid-19 waves &amp; rise in cost value.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Initially, the estimated cost for phase 1 was Rs. 5.35 lakh crores. But due to the delay in land acquisition, the cost has risen to Rs. 8.6 lakh crores.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Now, the expected completion date for phase 1 is FY 2026.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Phase 2<\/b><span style=\"font-weight: 400\">: 48877 km<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">The planning process for phase 2 has already begun by NHAI.<\/span><\/p>\n<h3><b>Current Status of the Bharatmala <\/b><strong>Pariyojana<\/strong><\/h3>\n<p><span style=\"font-weight: 400\">Currently, phase 1 of the Bharatmala Pariyojana is still under construction. And it is expected to be completed by FY 2026.<\/span><\/p>\n<p><span style=\"font-weight: 400\">And later on, phase 2 of the project will be started.<\/span><\/p>\n<h3><b>Completion Date of Bharatmala Pariyojana<\/b><\/h3>\n<p><img decoding=\"async\" class=\"alignnone wp-image-11305 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123410\/Completion-Date-of-Bharatmala-Project.jpg\" alt=\"Upcoming Infrastructure Projects in India 2025 - Bharatmala Pariyojana\" width=\"810\" height=\"391\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123410\/Completion-Date-of-Bharatmala-Project.jpg 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123410\/Completion-Date-of-Bharatmala-Project-300x145.jpg 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123410\/Completion-Date-of-Bharatmala-Project-768x371.jpg 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123410\/Completion-Date-of-Bharatmala-Project-750x362.jpg 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<p><span style=\"font-weight: 400\">The completion date of the project is only been decided for phase 1 which is 2026. And yet to be decided for phase 2 of the project.<\/span><\/p>\n<p><span style=\"font-weight: 400\">So, the overall project completion date is not been decided yet.<\/span><\/p>\n<h3><b>Impact On Real Estate<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The Bharatmala Pariyojana is connecting multiple cities. The real estate demand will also be boosted as people can travel easily across the nation.<\/span><\/p>\n<p><span style=\"font-weight: 400\">This connectivity will lead to an upsurge in the real estate industry across the nation by making it more profitable.<\/span><\/p>\n<h2><b>Mumbai Ahmedabad Bullet Train<\/b><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-11306 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123445\/Mumbai-Ahmedabad-Bullet-Train.jpg\" alt=\"Upcoming Infrastructure Projects in India 2025- Mumbai Ahmedabad Bullet Train\" width=\"810\" height=\"391\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123445\/Mumbai-Ahmedabad-Bullet-Train.jpg 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123445\/Mumbai-Ahmedabad-Bullet-Train-300x145.jpg 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123445\/Mumbai-Ahmedabad-Bullet-Train-768x371.jpg 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123445\/Mumbai-Ahmedabad-Bullet-Train-750x362.jpg 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<p><span style=\"font-weight: 400\">The Mumbai-Ahmedabad bullet train project is a 508 km long rail line.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The project is structured in such a way that it will have 12 stations, 3 rolling stock depots, eight maintenance depots, a Sabarmati passenger hub &amp; HSR training institute over the route.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The total cost of the Mumbai-Ahmedabad bullet train project is around Rs. 1.1 lakh crores.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The Mumbai to Ahmedabad travel time will be reduced from 7 to 8 hours to 2 hours &amp; 57 minutes via traveling through the Mumbai-Ahmedabad bullet train.<\/span><\/p>\n<p><span style=\"font-weight: 400\">And currently this project is one of the most look after among list of upcoming infrastructure projects in India.<\/span><\/p>\n<p>You can check out <a href=\"https:\/\/www.homebazaar.com\/knowledge\/mumbai-ahmedabad-bullet-train-map-ticket-price-and-latest-news\/\">Mumbai Ahmedabad Bullet Train 2025 \u2013 Map, &amp; Ticket Price<\/a> to know more about the project<\/p>\n<h3><b>Current Status of Mumbai-Ahmedabad Bullet Train<\/b><\/h3>\n<p><span style=\"font-weight: 400\">Initially, the Mumbai-Ahmedabad bullet train was in process in Gujarat. And in Maharashtra, the project was not in progress due to a land acquisition issue.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Now, the issue is been solved. And Maharashtra took growth in initiating the work for the project.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Now we can expect the completion of the Mumbai-Ahmedabad bullet train project soon.<\/span><\/p>\n<h3><b>Completion Date of Mumbai-Ahmedabad Bullet Train<\/b><\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-11307 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123607\/Completion-Date-of-Mumbai-Ahmedabad-Bullet-Train.jpg\" alt=\"Upcoming Infrastructure Projects in India 2025 - Mumbai Ahmedabad Bullet Train\" width=\"810\" height=\"391\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123607\/Completion-Date-of-Mumbai-Ahmedabad-Bullet-Train.jpg 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123607\/Completion-Date-of-Mumbai-Ahmedabad-Bullet-Train-300x145.jpg 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123607\/Completion-Date-of-Mumbai-Ahmedabad-Bullet-Train-768x371.jpg 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123607\/Completion-Date-of-Mumbai-Ahmedabad-Bullet-Train-750x362.jpg 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<p><span style=\"font-weight: 400\">Recently, Senior BJP said \u201cThe land acquisition issue in Maharashtra is been solved now. And now the project will seek huge growth in the completion of this project.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The planned completion date for this project is <\/span><b>August 2026.<\/b><\/p>\n<h3><b>Impact On Real Estate<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The real estate project demand will be impacted in a big way as this project helps in connecting two major metropolises.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Property in Thane<\/span><span style=\"font-weight: 400\">, Dombivali &amp; Kalyan is seeking huge growth as these localities are available at the closest proximity to this bullet train project. Whereas, Thane is also one of the stations for this project.<\/span><\/p>\n<h2><b>Navi Mumbai International Airport<\/b><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-11308 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123659\/Navi-Mumbai-International-Airport.jpg\" alt=\"Upcoming Infrastructure Projects in India 2025 - Navi Mumbai International Airport\" width=\"810\" height=\"391\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123659\/Navi-Mumbai-International-Airport.jpg 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123659\/Navi-Mumbai-International-Airport-300x145.jpg 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123659\/Navi-Mumbai-International-Airport-768x371.jpg 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123659\/Navi-Mumbai-International-Airport-750x362.jpg 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<p><span style=\"font-weight: 400\">The Navi Mumbai International Airport will be built on a total area of 1160 hectares.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The site of the project is situated in Mumbai\u2019s east Raigad district. This airport will be connected to the Chhatrapati Shivaji Maharaj International Airport through the metro line.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The airport will also be close to Mumbai via the currently under-construction Mumbai Trans Harbour link project.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Over the completion of the first phase of Navi Mumbai International Airport, it will be capable of managing 10 million passengers per year. And 25 million &amp; 60 million passengers over the completion of the 2nd &amp; last phases.<\/span><\/p>\n<p><span style=\"font-weight: 400\">And the estimated cost of the project is Rs. 16700 crores.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Navi Mumbai International Airport project is one of the most vast and revolutionary among upcoming infrastructure projects in India.<\/span><\/p>\n<h3><b>Current Status Of Navi Mumbai International Airport<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The Navi Mumbai International Airport is currently under construction.<\/span><\/p>\n<h3><b>Completion Date Of Navi Mumbai International Airport<\/b><\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-11309 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123804\/Completion-Date-Of-Navi-Mumbai-Internation-Airport.jpg\" alt=\"Upcoming Infrastructure Projects in India 2025- Navi Mumbai International Airport\" width=\"810\" height=\"391\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123804\/Completion-Date-Of-Navi-Mumbai-Internation-Airport.jpg 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123804\/Completion-Date-Of-Navi-Mumbai-Internation-Airport-300x145.jpg 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123804\/Completion-Date-Of-Navi-Mumbai-Internation-Airport-768x371.jpg 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123804\/Completion-Date-Of-Navi-Mumbai-Internation-Airport-750x362.jpg 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<p><span style=\"font-weight: 400\">Initially, it was planned that the construction of the first phase of the project will be completed in July 2024.<\/span><\/p>\n<p><span style=\"font-weight: 400\">As per the latest update, the first phase &amp; second phase is combined. And the construction of both phases will be completed in December 2024.<\/span><\/p>\n<p><span style=\"font-weight: 400\">And the Navi Mumbai International Airport opening will be held in 2025.<\/span><\/p>\n<h3><b>Impact On Real Estate<\/b><\/h3>\n<p><span style=\"font-weight: 400\">Over the completion of the Navi Mumbai International Airport, the <\/span><a href=\"https:\/\/www.homebazaar.com\/properties-in-navi-mumbai-mumbai\"><span style=\"font-weight: 400\">property in Navi Mumbai<\/span><\/a><span style=\"font-weight: 400\"> will seek a price appreciation of around 10 to 15%.<\/span><\/p>\n<p><a href=\"https:\/\/www.homebazaar.com\/properties-in-panvel-mumbai\"><span style=\"font-weight: 400\">Property in Panvel<\/span><\/a><span style=\"font-weight: 400\">, Kamothe, Ulwe, Taloja, Kharghar, etc will be benefited largely.<\/span><\/p>\n<h2><b>Mumbai Trans Harbour Link<\/b><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-11311 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123947\/Mumbai-Trans-Harbour-Link-Project.jpg\" alt=\"Upcoming Infrastructure Projects in India 2025 - Mumbai Trans Harbour Link\" width=\"810\" height=\"391\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123947\/Mumbai-Trans-Harbour-Link-Project.jpg 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123947\/Mumbai-Trans-Harbour-Link-Project-300x145.jpg 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123947\/Mumbai-Trans-Harbour-Link-Project-768x371.jpg 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08123947\/Mumbai-Trans-Harbour-Link-Project-750x362.jpg 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<p><span style=\"font-weight: 400\">The Mumbai Trans Harbour Link project has another name as Sewri-Nhava Sheva Trans Harbour link.<\/span><\/p>\n<p><span style=\"font-weight: 400\">This project is a 21.8km long &amp; 27 meters wide 6-lane expressway. This roadway will link Mumbai to Navi Mumbai.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Over the completion of the project, Mumbai Trans Harbour Link will be the longest sea bridge in India.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The bridge will start from Sewri of South Mumbai. And later will pass through Thane Creek and end at Chirle close to Nhava Sheva.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The total estimated cost of the project is Rs. 17843 crores.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Mumbai Trans Harbour Link is currently one of connectivity enhancing project among upcoming infrastructure projects in India.<\/span><\/p>\n<h3><b>Current Status Of Mumbai Trans Harbour Link<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The Mumbai Trans Harbour Link project is currently under construction.<\/span><\/p>\n<h3><b>Completion Date of Mumbai Trans Harbour Link<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The Mumbai Trans Harbour Link is ready for use by the public.<\/span><\/p>\n<h3><b>Impact On Real Estate<\/b><\/h3>\n<p><span style=\"font-weight: 400\">This project will allow faster travel to various cities.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">And it will also impact the growth of <\/span><span style=\"font-weight: 400\">property in Thane<\/span><span style=\"font-weight: 400\">, Nashik, Pune &amp; <\/span><span style=\"font-weight: 400\">property in Panvel<\/span><span style=\"font-weight: 400\">.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Raigad being a neighboring district will also experience a raise in real estate prices.<\/span><\/p>\n<h2><b>Delhi-Mumbai Industrial Corridor<\/b><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-11312 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124049\/Delhi-Mumbai-Industrial-Corridor.jpg\" alt=\"Upcoming Infrastructure Projects in India 2025 - Mumbai Trans Harbour Link\" width=\"810\" height=\"391\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124049\/Delhi-Mumbai-Industrial-Corridor.jpg 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124049\/Delhi-Mumbai-Industrial-Corridor-300x145.jpg 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124049\/Delhi-Mumbai-Industrial-Corridor-768x371.jpg 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124049\/Delhi-Mumbai-Industrial-Corridor-750x362.jpg 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<p><span style=\"font-weight: 400\">The <\/span><a href=\"https:\/\/nicdc.in\/images\/documents\/DMIC_Executive_Summary.pdf\" rel=\"nofollow noopener\" target=\"_blank\"><span style=\"font-weight: 400\">Delhi-Mumbai Industrial Corridor<\/span><\/a><span style=\"font-weight: 400\"> (DMIC) will be covering a total length of 1504 km.<\/span><\/p>\n<p><span style=\"font-weight: 400\">It will be passing through states such as Uttar Pradesh, Haryana, Delhi NCR, Rajasthan, Gujarat &amp; Maharashtra. And it will cover 89 districts in the mentioned states.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The ending terminals of this industrial corridor will be Dadri in Delhi NCR &amp; Jawaharlal Nehru Port (JNPT) in Mumbai.<\/span><\/p>\n<p><span style=\"font-weight: 400\">It is estimated that this project will help in the growth of the manufacturing output value by 3.5 times between 2010 to 2020 i.e Rs. 15.2 billion to Rs. 52.8 billion.<\/span><\/p>\n<p><span style=\"font-weight: 400\">And between 2010 to 2040, the estimated growth will be 14 times i.e increasing to Rs. 212.6 billion.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-11313 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124115\/Current-Status-Of-Delhi-Mumbai-Industrial.jpg\" alt=\"Upcoming Infrastructure Projects in India 2025 - Mumbai Trans Harbour Link\" width=\"810\" height=\"391\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124115\/Current-Status-Of-Delhi-Mumbai-Industrial.jpg 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124115\/Current-Status-Of-Delhi-Mumbai-Industrial-300x145.jpg 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124115\/Current-Status-Of-Delhi-Mumbai-Industrial-768x371.jpg 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124115\/Current-Status-Of-Delhi-Mumbai-Industrial-750x362.jpg 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<h3><b>Current Status Of Delhi-Mumbai Industrial Corridor<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The Delhi-Mumbai Industrial Corridor project is currently under construction.<\/span><\/p>\n<h3><b>Completion Date of Delhi-Mumbai Industrial Corridor<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The expected completion date of the Delhi-Mumbai Industrial Corridor is 2040. And this <\/span><span style=\"font-weight: 400\">project is one of the most impactful upcoming infrastructure projects in India.<\/span><\/p>\n<h3><b>Impact On Real Estate<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The Delhi-Mumbai Industrial Corridor will impact as an infrastructural upgrade along with developments of industries &amp; businesses.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">As industry operations are going to increase this will result from a rise in demand for office areas &amp; industrial land.<\/span><\/p>\n<p><span style=\"font-weight: 400\">And employment opportunities are also going to increase which will impact a rise in demand for residential <\/span><a href=\"https:\/\/www.homebazaar.com\/properties-in-mumbai\"><span style=\"font-weight: 400\">property in Mumbai<\/span><\/a><span style=\"font-weight: 400\">, Rajasthan, Madhya Pradesh, Gujarat, etc.<\/span><\/p>\n<h2><b>Sagarmala Project<\/b><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-11314 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124157\/Sagarmala-Project-map.png\" alt=\"Upcoming Infrastructure Projects in India 2025- Sagarmala Project\" width=\"810\" height=\"391\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124157\/Sagarmala-Project-map.png 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124157\/Sagarmala-Project-map-300x145.png 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124157\/Sagarmala-Project-map-768x371.png 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124157\/Sagarmala-Project-map-750x362.png 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<p><span style=\"font-weight: 400\">The <\/span><a href=\"http:\/\/sagarmala.gov.in\/about-sagarmala\/background\" rel=\"nofollow noopener\" target=\"_blank\"><span style=\"font-weight: 400\">Sagarmala Project<\/span><\/a><span style=\"font-weight: 400\"> aims to have a big impact in the logistics sector of India. It will be done by maximizing the potential of the waterways &amp; coastline of India.<\/span><\/p>\n<p><span style=\"font-weight: 400\">This project is aimed at reducing the cost of logistics for EXIM &amp; domestic cargo. And it is planned to achieve a total cost saving of Rs. 35000-40000 crores per annum.<\/span><\/p>\n<p><span style=\"font-weight: 400\">This can be done by achieving the following objectives as mentioned below.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-11315 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124307\/Infographics-Sagarmala.png\" alt=\"Upcoming Infrastructure Projects in India 2025 - Sagarmala Project\" width=\"810\" height=\"391\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124307\/Infographics-Sagarmala.png 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124307\/Infographics-Sagarmala-300x145.png 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124307\/Infographics-Sagarmala-768x371.png 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124307\/Infographics-Sagarmala-750x362.png 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<p><span style=\"font-weight: 400\">Sagarmala is estimated to minimize the carbon emissions from transportation by almost 12.5 MT per annum.<\/span><\/p>\n<h3><b>Current Status Of Sagarmala Project<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The Sagarmala project is currently in progress.<\/span><\/p>\n<h3><b>Completion Date Of Sagarmala Project<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The expected competition date of the Sagarmala project is 2035. T<\/span><span style=\"font-weight: 400\">his is the most anticipated <\/span><span style=\"font-weight: 400\">upcoming infrastructure project in India right now.<\/span><\/p>\n<h2><b>Chenab Rail Bridge<\/b><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-11316 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124355\/Chenab-Rail-Bridg-1.png\" alt=\"Upcoming Infrastructure Projects in India 2025 - Chenab Rail Bridge\" width=\"810\" height=\"391\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124355\/Chenab-Rail-Bridg-1.png 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124355\/Chenab-Rail-Bridg-1-300x145.png 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124355\/Chenab-Rail-Bridg-1-768x371.png 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124355\/Chenab-Rail-Bridg-1-750x362.png 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<p><span style=\"font-weight: 400\">The Chenab Rail Bridge is a concrete &amp; steel arch bridge. It crosses the Chenab River with a height of 1178 ft above sea level.<\/span><\/p>\n<p><span style=\"font-weight: 400\">This bridge is 35 m higher compared to the Eiffel Tower in Paris.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The overall length of the bridge is 1315 m. The bridge is between Kauri &amp; Bakkal. This is just 42 km away from the Reasi town of Jammu &amp; Kashmir.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Currently, the Chenab rail bridge is the World\u2019s highest rail bridge. This made the Chenab Rail Bridge <\/span><span style=\"font-weight: 400\">project to stand as one of the most challenging &amp; significant upcoming infrastructure projects in India.<\/span><\/p>\n<h3><b>Current Status Of Chenab Rail Bridge<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The Chenab rail bridge is fully completed. The inauguration of the bridge was done on August 2022.<\/span><\/p>\n<h3><b>Completion Date Of Chenab Rail Bridge<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The Chenab Rail Bridge is ready for operational.<\/span><\/p>\n<h2><b>Thane Borivali Tunnel<\/b><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-11317 size-full\" src=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124438\/Thane-Borivali-Tunnel.jpg\" alt=\"Upcoming Infrastructure Projects in India 2025- Thane Borivali Tunnel\" width=\"810\" height=\"391\" srcset=\"https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124438\/Thane-Borivali-Tunnel.jpg 810w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124438\/Thane-Borivali-Tunnel-300x145.jpg 300w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124438\/Thane-Borivali-Tunnel-768x371.jpg 768w, https:\/\/homebazaar-blog.s3.ap-south-1.amazonaws.com\/knowledge\/wp-content\/uploads\/2023\/03\/08124438\/Thane-Borivali-Tunnel-750x362.jpg 750w\" sizes=\"(max-width: 810px) 100vw, 810px\" \/><\/p>\n<p><span style=\"font-weight: 400\">The Thane Borivali Tunnel is designed to reduce the journey time along Thane to Borivali from 1 to 2 hours to 15 to 20 minutes.<\/span><\/p>\n<p><span style=\"font-weight: 400\">This twin tunnel will have 3 lanes in each. And the tunnel will begin from Tikujiniwadi in Thane &amp; the ending point is on the Western Express Highway of Borivali.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Speed cameras, advanced lighting, smoke detectors, fire extinguishers, etc are the facilities provided for the safety of travelers.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The total cost of the Thane Borivali Tunnel project is Rs. 13200 crores.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Over the completion of this tunnel, it will be the longest tunnel in Maharashtra.<\/span><\/p>\n<h3><b>Current Status Of Thane Borivali Tunnel<\/b><\/h3>\n<p><span style=\"font-weight: 400\">Previously, due to multiple reasons the construction of the tunnel got postponed.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">And now the construction of the project is been planned to be initiated by the monsoon season of 2023.<\/span><\/p>\n<h3><b>Completion Date of Thane Borivali Tunnel<\/b><\/h3>\n<p><span style=\"font-weight: 400\">MMRDA has decided to complete this project by 2027. This much time is a must because the tunnel has to be constructed 23m beneath the surface.<\/span><\/p>\n<h3><b>Impact On Real Estate<\/b><\/h3>\n<p><span style=\"font-weight: 400\">The Thane Borivali Tunnel is expected to bring a big impact on a rise in demand for <\/span><a href=\"https:\/\/www.homebazaar.com\/properties-in-borivali-mumbai\"><span style=\"font-weight: 400\">property in Borivali<\/span><\/a><span style=\"font-weight: 400\">, Ghod-bunder road, Dahisar &amp; <\/span><span style=\"font-weight: 400\">Thane<\/span><span style=\"font-weight: 400\">.<\/span><\/p>\n<p><span style=\"font-weight: 400\">As the traveling time will be reduced, it is estimated that this will impact in rise of property prices as well.<\/span><\/p>\n<h2><b>FAQs<\/b><\/h2>\n<table>\n<tbody>\n<tr>\n<td><b>What are the upcoming infrastructure projects in India?<\/b><\/p>\n<p><span style=\"font-weight: 400\">Bharatmala Pariyojana, Mumbai Ahmedabad Bullet Train, Navi Mumbai International Airport, Mumbai Trans Harbour Link, Delhi-Mumbai Industrial Corridor, Sagarmala, etc are the latest upcoming infrastructure projects in India.<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>What is the completion date of Bharatmala Pariyojana?<\/b><\/p>\n<p><span style=\"font-weight: 400\">The completion date of the Bharatmala Pariyojana<\/span> <span style=\"font-weight: 400\">for phase 1 is 2026. And the overall project completion date is not been decided yet<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>What is the date of completion for the Mumbai-Ahmedabad Bullet Train?<\/b><\/p>\n<p><span style=\"font-weight: 400\">The land acquisition issue in Maharashtra was not progressing due to some reasons. But now it is been solved. And now the project is to be completed by August 2026<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Is Sagarmala ready for operations?<\/b><\/p>\n<p><span style=\"font-weight: 400\">The expected competition date of the Sagarmala project is 2024.<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>When will Navi Mumbai International Airport be ready to function?<\/b><\/p>\n<p><span style=\"font-weight: 400\">The Navi Mumbai International Airport will be ready for people by 2025.<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Bharatmala Pariyojana The Bharatmala Pariyojana is said to be the second-largest highway project in India. And National Highways Development project is the first one on the list. The prime focus of the Bharatmala Pariyojana construction is to optimize the efficiency of the movement of goods and people across India. The project will be connecting 550 [&hellip;]<\/p>\n","protected":false},"author":12,"featured_media":18013,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[415],"tags":[2285,2287,2286,34,2288,3505],"class_list":["post-11300","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-guides-2","tag-bharatmala-pariyojana","tag-delhi-mumbai-industrial-corridor","tag-mumbai-ahmedabad-bullet-train","tag-navi-mumbai-international-airport","tag-sagarmala-project","tag-upcoming-infrastructure-projects-in-india-2025"],"_links":{"self":[{"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/posts\/11300","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/comments?post=11300"}],"version-history":[{"count":9,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/posts\/11300\/revisions"}],"predecessor-version":[{"id":17522,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/posts\/11300\/revisions\/17522"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/media\/18013"}],"wp:attachment":[{"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/media?parent=11300"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/categories?post=11300"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.homebazaar.com\/knowledge\/wp-json\/wp\/v2\/tags?post=11300"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}